Work includes digouts (asphalt patches), conform grinding, and overlay work. Note, final overlay work will occur after chipseal has been placed. Expect up to delays on affected roads and at driveways marked for conform grinding or digouts.
Work includes Type III Microsurfacing, Asphalt Rubberized Chipseal, and Type II Slurry Seal. Lanes will be closed and driveway access will be blocked during Type III Microsurfacing and Type II Slurry Seal operations. The Contractor will post doorknob hangers a few days prior to this work.
CLICK HERE FOR PROJECT ROAD LIST (including treatments and limits)
Includes:
Portions of Portola Dr, 13th Ave, and Corcoran Ave.
Includes:
Elva Dr, Townsend Dr, Kingsbury Dr, Appleton Dr, Farley Dr, Kenneth Dr, Baldwin Dr, Lamanda Dr, Mirada Dr, Granada Dr, Toledo Dr
Includes:
Elena Dr, Canepa Dr, Miraflores Dr, and portions of La Cuesta Dr, El Sereno Dr, and Altenitas Rd.
Includes:
El Solyo Heights Dr, Hacienda Wy, Hillview Dr, and Capelli Dr